Changing an Egyptian Part-Load Order After Confirmation 2026: Adding, Cutting and Swapping Products Before Loading

Changing a part-load order after confirmation is normal and most suppliers expect it, but every type of change has a cut-off point and the cost rises sharply once that point passes. A quantity adjustment made ten days before gate-in costs nothing. The same adjustment made the morning the truck is loading costs a repalletised load, a revised packing list and possibly a missed sailing. Knowing where each deadline sits is what separates a flexible buyer from an expensive one.

Row of reefer containers on the quay, the point after which changing a part-load order is no longer possible
Once the container is gated in, the only remaining variable is the destination paperwork.

What can still be changed, and how late?

Deadlines below are counted back from gate-in, which is normally two to three days before the vessel sails. They assume a shared reefer with three to six buyers, which is the case where changes are hardest, because your amendment moves somebody else’s pallets too.

Cut-off points for changing a part-load order on an Egyptian shared reefer, counted back from gate-in, with the typical cost of a late change.
ChangeLatest pointCost if later
Quantity up or down within 10%72 hours before gate-inUsually absorbed if space allows
Quantity change above 10%7 days before gate-inRepricing, the load may need rebalancing
Swap one product for another7 days before gate-inOnly if the set point still works for the whole load
Change size or count72 hours before gate-inSubject to what the grading line actually produced
Change carton format10 days before gate-inStock-dependent, changes pallet maths
Printed or private label cartons21 to 30 days before gate-inPrint run lead time, no late option
Adhesive labels and lot codes5 days before gate-inRelabelling charge per carton
Change destination portBefore booking confirmationNew booking, possible loss of the slot
Change IncotermBefore booking confirmationFreight and insurance both reprice
Consignee or notify party detailsBefore the bill of lading is issuedAmendment fee after issue

Why swapping a product is harder than changing the quantity

A shared reefer runs on one temperature. Replacing two pallets of citrus at 5 C with two pallets of sweet potato at 13 C does not affect your goods alone, it makes the container impossible to set correctly for anybody. Swaps within a temperature band are usually straightforward. Swaps across bands are refused, and refusal is the right answer. The compatibility rules are in temperature and ethylene compatibility in a mixed reefer.

Every change is a pallet maths change

Cutting your line by four cartons sounds trivial and is, provided the pallet still builds to a full tier. Cutting it by a third leaves a half-height pallet that either travels with a void, which is a stability risk, or gets rebuilt, which costs labour and delays the whole load. When you need to reduce, reduce by whole layers rather than by carton count and tell the supplier which layer you are dropping. The arithmetic is set out in pallet space planning in a mixed reefer.

How to send an amendment so it is actioned the same day

Reply on the original order thread rather than opening a new one, quote the proforma number, and state the change as a replacement line rather than a description. Write the line you want to end up with, in full, with product, variety, size or count, carton format, number of cartons and pallet count. Confirm whether the delivery week is fixed or can move. An amendment written that way is repriced in an hour. An amendment written as a paragraph of prose takes a day of questions, and on a shared container a day is often the whole margin you had. The timeline every change sits inside is in how a mixed container comes together, day by day.

Peivana is the supplier, not a neutral broker. The deadlines above are our own working cut-offs and other Egyptian suppliers will differ, so confirm them against your proforma rather than assuming they are standard.


To amend a confirmed order, check whether a change is still possible before a sailing, or get a same-day quote on a revised part-load, message Peivana on WhatsApp at +20 10 9911 1918 with your proforma number and the revised line.